United Engines - Power Generation
Sometimes it's difficult to install a generator in the location specified by the customer. With the help of Belger Cartage Service, we were able to set an MTU On-site Energy 200 kW and a 250 kW both with sound attenuated enclosures and 48 hour fuel tanks in a very tight space. Our experience and relationships ensure a quality installation on every project. See our website at www.unitedpowergen.com for more information.
Sometimes it's difficult to install a generator in the location specified by the customer. With the help of Belger Cartage Service, we were able to set an MTU On-site Energy 200 kW and a 250 kW both with sound attenuated enclosures and 48 hour fuel tanks in a very tight space. Our experience and relationships ensure a quality installation on every project. See our website at www.unitedpowergen.com for more information.